Salient Features
A. | TRACK | |||||
Gauge | Broad Gauge (1676 mm) | |||||
Route Length | 738.941km | |||||
Ruling Gradient | 1 in 150 (compensated) (0.67 percent) | |||||
Rails | 52 kg 90 UTS (Long Welded Rails for Roha-TOK Down line) 60 Kg 90 UTS(Long Welded Rails for Roha-Veer Up line) | |||||
Sleepers | Pre Stressed Concrete (PSC) mono block sleepers @ 1540no.s per KM for Down line and at 1660 No per Km for UP line(ROHA-VEER). | |||||
Turn Outs | 1 in 12, 52kg Thick Web Switches on PSC Sleepers | |||||
No. of curves | 340 Nos in ROHA-TOK DN line and 42 Nos in ROHA-VEER Up line | |||||
Signalling | Multiple Aspect Colour Light Signals (Panel Interlocking / Electronic Interlocking corresponding to Standard III) | |||||
B. | EARTHWORK | |||||
Maximum Height - Embankment | 25m | |||||
Deepest Cutting | 50m | |||||
Total length in Cuttings | 223.786km | |||||
C. | STATIONS | |||||
Total No. of Stations | 72 | |||||
More than 3 lines | 16 | |||||
3 lines | 29 | |||||
2 lines | 23 | |||||
Halt | 04 | |||||
D. | BRIDGES | 2286 | ||||
Major Bridges | 190 (Linear waterway 19.823km) | |||||
Minor Bridges | 1701 ( Liner waterway of 5.58km) | |||||
No. of Road Crossings | 395 ( Road over Bridges/Road under Bridges/Foot Over Bridges & Aquaduct) | |||||
Longest span Concrete Bridges | 53.5 m (PSC Box Culvert) | |||||
longest Span Steel Bridges | 124.2 m (open web steel through girder) on river Zuari and Mandovi in Goa | |||||
Longest Bridge | (2065.8 m) Across Sharavati river in Honnavar | |||||
Tallest Viaduct | 64 m high Panval Nadi in Ratnagiri | |||||
First Bridge to be launched by Incremental Launching | Panval Nadi Viaduct (420m long) PSC box girder | |||||
E. | TUNNELS | |||||
Number of Tunnels | 91 no. ( Total length 84.496 km) | |||||
Longest Tunnel | 6.5km (Karbude Tunnel near Ratnagiri) | |||||
Number of tunnels with Ballastless track | 06 nos. | |||||
F | Savings in Distance (Kms.) | SECTOR | Other Route | Konkan Railway Route | Saving | |
Mangaluru - Mumbai | 2041 | 914 | 1127 | |||
Mangaluru- Ahmedabad | 2653 | 1358 | 1295 | |||
Mangaluru - Delhi | 3033 | 2249 | 784 | |||
Cochin- Mumbai | 1849 | 1336 | 513 | |||
| Savings in Travel Time (Hrs.) | Mumbai -Mangalore | 41 | 15 | 26 | |
Mumbai - Cochin | 36 | 24 | 12 | |||
Mumbai - Goa | 20 | 10 | 10 | |||
H. | Project Cost | Rs. 3555 Crores | ||||