Rail Link

KUDGI SUPER THERMAL POWER PLANT - KARNATAKA

  • KUDGI SUPER THERMAL POWER PLANT - KARNATAKA
  • KUDGI SUPER THERMAL POWER PLANT - KARNATAKA
Overview

NTPC awarded KRCL the work of preparation of Detailed Project Report (DR), Project Management and Construction of Coal Transportation System at Kudgi, Karnataka. The Project costing INR 446 crore has a route length of 11.65 km and a track length of 37.7 km with 16 minor bridges and 15 lines of in- plant yard. Construction of a 700 meter long PSC girder bridge was executed in a record time of six months.

GADARWARA SUPER THERMAL POWER PLANT - MADHYA PRADESH

  • GADARWARA SUPER THERMAL POWER PLANT - MADHYA PRADESH
Overview

The work of Rail Connectivity for Super Thermal Power Plant (2X800 MW) at Gadarwara, Madhya Pradesh was awarded to KRCL in June 2014 under a Project Management Consultancy Contract (PMC) at INR 312.39 crore. The work consists of 43 Km of track with earthwork of 41.50 lakh Cum and 32 bridges. The cost of the Project is INR 711 crore.

Roha Veer track doubling

  • Roha Veer track doubling
Overview

Roha – Veer Doubling

 

The doubling work of Roha-Veer section was completed at a cost of INR 590 crore and was commissioned on 30th August 2021 for traffic.  Indapur station was commissioned as a new Crossing Station on 28th February 2022 an Goregaon Road station was commissioned on 18th March 2022. The Commercial Operation Date (COD) of the project was declared as 26 January 2022.