Standardization of LHB rake trains of Lokmanya Tilak (T) depot

Standardization of LHB rake trains of Lokmanya Tilak (T) depot

It has been decided by Central Railway to standardize the following LHB rake trains of Lokmanya Tilak (T) depot on permanent basis. Details are as under :

Train no. 

Existing composition

Revised composition

With Effect from 

22113 / 22114 Lokmanya Tilak (T) - Kochuveli - Lokmanya Tilak (T)  Bi-Weekly Express 

 

Composite (First AC + Second AC) -  01 Coach 2 Tier AC - 01 Coach

3 Tier AC - 05 Coaches

Sleeper - 09 Coaches

General - 04 Coaches

Generator Car- 02 

 

Total = 22 LHB Coaches

2 Tier AC - 01 Coach

3 Tier AC - 07 Coaches

Sleeper - 09 Coaches

General - 03 Coaches

Generator Car - 02 


 

Total = 22 LHB Coaches

Train no. 22113  ex. Lokmanya Tilak (T)  from 04/11/2023

Train no. 22114 ex. Kochuveli  from 06/11/2023

11099 / 11100 Lokmanya Tilak (T) - Madgaon Jn. - Lokmanya Tilak (T) Express

(Four Days a Week)

 

Composite (First AC + Second AC) -  01 Coach 2 Tier AC - 01 Coach

3 Tier AC - 08 Coaches

Sleeper - 06 Coaches

General - 03 Coaches

Generator Car- 02 

Pantry Car - 01


 

Total = 22 LHB Coaches

Composite (First AC + Second AC) -  01 Coach 

2 Tier AC - 02 Coach

3 Tier AC - 06 Coaches

Sleeper - 08 Coaches

General - 02 Coaches

Generator Car- 01

SLR - 01  

Pantry Car - 01

 

Total = 22 LHB Coaches

Train no. 11099 ex. Lokmanya Tilak (T) from 10/11/2023

Train no. 11100 ex. Madgaon Jn.. from 10/11/2023

For detailed halts and timings of above trains please visit www.enquiry.indianrail.gov.in or download NTES App.

Passengers are requested to kindly note the same.

 

Girish Karandikar
Dy. General Manager / PR